Progress Report

The new cabinets for the kitchen and bathrooms are here. The lockers and chairs have been ordered. The new lighting fixtures are on their way. We’ve replaced the sprinkler heads with new ones.

We’ve hit a little snag in our schedule though. The floors aren’t ready yet and we can’t paint the walls until the floors are finished. This means we can’t install the cabinets because we need the walls painted first.

The wood floor is coming along. We’ve sanded and patched the original wood. The staining and sealing is going slower that planned because of the rain, which makes each layer dry more slowly. It should be done this week though.

We’ve been having trouble getting the concrete floor re-finished. Hopefully it will be done next week. Think good thoughts for the concrete floor.

We’re aiming to open mid-December and have some Trial-Time slots open so people can come try out the space. We’re also planning some events/workshops for those looking for a creative distraction from the consuming during the holiday season.